Like any wood product.
Can you put engineered hardwood on concrete.
1 nail down requires plywood sub flloor you can t nail into concrete last i checked 2.
You need to remedy both problems before you can glue engineered hardwood on top of it.
Follow these steps to install an engineered wood floor in your home.
Before you prepare the concrete for hardwood flooring it must be dry.
You usually determine this with a meter that compares the relative humidity of the slab with the ambient humidity.
If you want to install a new floor but currently have a concrete slab for flooring you might be wondering whether it s possible to install a hardwood floor.
Glue down engineered hardwoods can be glued note.
Sometimes concrete can be uneven and possibly contain high levels of moisture.
Fortunately even if your home was built on a concrete slab you can.
Does this mean you can t get hardwood.
Engineered wood flooring offers the timeless look of hardwood but is perfect for basements and other areas where moisture can be an issue.
Engineered hardwood is sturdier than traditional plank but surface preparation still matters.
If you re curious how to install hardwood floor on concrete slab there are a few things you should know.
Solid hardwood can not be glued except for bamboo 3.
Gluing works well when you are installing engineered hardwood over a concrete subfloor but be sure you clearly understand the manufacturer s application instructions before you glue that floor.
Plan to nail down the engineered hardwood flooring when you have a wood subfloor.
Float this is when the hardwood is clicked into each other or glued at joints but is not attached to the floor.
Experienced professionals pay close attention to managing moisture and minimizing wood floor expansion and contraction when preparing to install hardwood floors on concrete slabs.
The standard industry rule of thumb is to allow one month per one inch.
Installing a hardwood floor over a concrete slab even if your home was built on a concrete slab you can still enjoy the beauty and charm of hardwood floors.
Use your moisture meter to judge the moisture content of.
If the slab is new don t even begin moisture testing until 30 days after pouring it it probably won t be ready to be covered until 60 days after.